Abstract:

As a result of the specific requirements of Increments A, B, and G of Contract No. DACA65-81-C-0020, WESTON has performed an extensive energy engineering analysis of various facilities at the Military Ocean Terminal, Bayonne, New Jersey MOTBY. The analysis has included the following 1 Site surveys. 2 Examination and inspection of system drawings. 3 Development of mechanical equipment lists. 4 Identification of equipment capacities and building loads. 5 Determination of utility energy consumption quantities and prices. The study has similarly included the development and evaluation, accordingto U.S. Army ECIP criteria, of various energy conservation measures ECMs. A significant number of preliminary opportunities were considered. Based on extensive review and consideration of total MOTBY operations, a final concensus listing was identified and detailed evaluations performed. This report lists the results of the detailed evaluation of the energy conservation measures and presents them as proposed ECIP projects. In addition, historical basewide energy consumption and the energy savings and energy cost savings based on implementation of the identified projects is include

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms