Summary of M113A1 Armored Personnel Carrier (APC) Leakage Testing.

reportActive / Technical Report | Accession Number: ADA081006 | Open PDF

Abstract:

This report summarizes three sets of M113A1 Armored Personnel Carrier APC leakage data which were acquired from Aerophysics Company, Donaldson Company, and Research Division, Chemical Systems Laboratory. The average leakage value for the M113A1 APC is 458 cu ftmin at 1.5-inches water gage. Six leakage reduction measures are suggested that have a potential of reducing the M113A1 APC leakage value to 110 cu ftmin at 1.5-inches water gage. Areas where leakage reduction is possible include the commanders turret ring, scupper valve, air ventilator control, air inlet valve, hatchesdoors, and bilge pump discharge line.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms