Statistical PERT: An Improved Subnetwork Analysis Procedure

reportActive / Technical Report | Accession Number: ADA020470 | Open PDF

Abstract:

Statistical PERT is a new procedure for obtaining information about the distribution of a projects completion time when the project is comprised of a large number of activities and the time required to complete an individual activity once it can be begun is a random variable. The project is represented as an acyclic network whose arcs correspond to the project activities. This network is simplified by replacing various activity configurations by single equivalent activities and then decomposed into several subnetworks. The distribution and moments of each subnetworks completion time are bounded and approximated on the basis of two points from each activitys completion time distribution by using some mathematical programming techniques and a new result in the theory of networks. The projects completion time distribution is then approximated by combining the approximate subnetwork distributions. This report describes several refinements in the subnetwork analysis procedure.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release
Distribution Statement:
Approved For Public Release; Distribution Is Unlimited.

RECORD

Collection: TR
Identifying Numbers
Subject Terms