Developing an Adaptable Best Value Contractor Selection Tool for Federal Construction Projects

reportActive / Technical Report | Accesssion Number: AD1174067 | Open PDF

Abstract:

Currently, there is no Air Force-wide best practice or standard for using an other-than lowest price source selection process for construction projects. Installations often award contracts using Lowest Price Technically Acceptable (LPTA) because ofperceived cost and time savings. However, a heavy reliance on LPTA often leads to long-term decreases in quality and value. To allow the Air Force to receive the best value for its construction funding, a simple and adaptable tool was developed that allows installations to pursue contractor selection for construction projects by other-than lowest price methods.