Information System Requirements for ICAM Sheet Metal Center. Volume III. System Environment.

reportActive / Technical Report | Accession Number: ADB068013 | Need Help?

Abstract:

This Final Report describes results of the Computer-Based Information System CBIS project conducted for the Integrated Computer Aided Manufacturing ICAM Program. This project Priority 3101 defined the requirements of a computer network that would integrate the functions of aerospace batch manufacturing. This Final Report is presented in four volumes. This part, Volume 3, is a System Environment Document, which describes the functions, components, and performance of a composite existing ASIS CBIS.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release
Distribution Statement:
Approved For Public Release; Distribution Unlimited.

RECORD

Collection: TR
Identifying Numbers
Subject Terms