Haditha Dam Perimeter Security Haditha, Iraq. Sustainment Assessment

reportActive / Technical Report | Accession Number: ADA518576 | Open PDF

Abstract:

The objective of this project assessment was to provide real-time information on relief and reconstruction to interested parties to enable appropriate action to be taken, if warranted. Specifically, SIGIR determined whether the project was operating at the capacity stated in the original contract. To accomplish this, SIGIR determined whether the project was at full capability or capacity when accepted by the U.S. government, when it was transferred to Iraqi operators, and when SIGIR inspected the site.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release
Distribution Statement:
Approved For Public Release; Distribution Is Unlimited.

RECORD

Collection: TR
Identifying Numbers
Subject Terms