Townshend Lake: Periodic Inspection Report No. 4 West River Townshend, Vermont

reportActive / Technical Report | Accession Number: ADA382469 | Open PDF

Abstract:

This inspection has been conducted under the authority in ER 1110-2-100, which provides for the Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures. The purpose of the inspection is to examine the physical condition of the Townshend Lake project as part of a continuing program to insure its structural stability, safety, and operational adequacy. The field examination includes soils and geologic aspects of embankments, channels, and other components, as well as structural, concrete, mechanical, electrical, and hydrologic and hydraulic features of the project.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms