Energy Audits of Boiler & Chiller Plants, Energy Engineering Analysis Program, Fort Bragg, North Carolina, Volume 1: Narrative Report.
Abstract:
This document constitutes the Pre-Final Submittal for Contract DACA21-84-C-0603, Energy Audits of BoilerChiller Plants, Ft. Bragg, North Carolina. The purpose of this report is to indicate the work accomplished to date, show samples of field data collected, illustrate the methods and justifications of the approaches taken, outline the present conditions, and make recommendations for the potential energy efficiency improvements to the central energy plants of Fort Bragg. The specific buildings analyzed are 1 Building C-1432 82nd Heating Plant 2 Building D-3529 JFK Heating Cooling Plant, and 3 Building C-6039 82nd Chiller Plant. The following buildings were part of the original scope of work, but were deleted for reasons explained further in Section 1.0 of this report 1 Building C-7549 Standby Plant for C-1432 2 Building N-6002 New EM Barracks Complex and 3 Building H-6240 H Area Chiller Plant.