Basewide Energy System Plan, Oakland Army Base, Oakland, California.

reportActive / Technical Report | Accession Number: ADA330468 | Open PDF

Abstract:

This analysis is undertaken to assist the 0akland Army Base OARB in meeting the goals established by the Army Facilities Energy Plan to reduce consumption by 20 percent by 1985. Projects selected for implementation as a result of this analysis will enable OARB to achieve the 1985 goal. Total annual energy savings from implementing Increment A, B, and G projects will be approximately 75,000 MBTUs. The total cost of these projects is estimated at approximately 3.0 million. The implementation of Increment F projects will result in an additional annual energy savings of 41,900 MBTUs per year at an implementation cost of 80,000. Total savings for ail projects are estimated at 117,000 MBTUs at a cost of about 3.08 million.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms