Energy Engineering Analysis Program (EEAP), Limited Energy Study - Lighting, Fort Campbell, Kentucky. Volume 2, Section 6 and Appendices A-D.
Abstract:
The objective of this project is to replace existing interior lighting with high efficiency fixtures and lamps at the Korean War Barracks. The replacement of the existing lighting will reduce energy consumption and life cycle operating costs for the Barracks in accordance with the Army Energy Resources Management Plan ERMP and Executive Order 12759.
Security Markings
DOCUMENT & CONTEXTUAL SUMMARY
Distribution:
Approved For Public Release
RECORD
Collection: TR