OC-135B Open Skies (Phase 2 Upgrade) QOT&E.
Abstract:
This report contains the results of a preliminary assessment conducted as part of the qualification operational test and evaluation of the OC-135B Open Skies Phase II Upgrade. The purpose of the assessment was to determine user satisfaction with the upgrade at its current stage of development. The assessment was conducted using an operationally representative training sortie planned by the On-Site Inspection Agency. The system program office is to use the results to maximize user satisfaction with the completed upgrade.
Security Markings
DOCUMENT & CONTEXTUAL SUMMARY
Distribution:
Approved For Public Release
RECORD
Collection: TR