Storm Water Pollution Prevention Plan for Construction Activities.

reportActive / Technical Report | Accession Number: ADA291464 | Open PDF

Abstract:

All construction sites as Robins AFB, Georgia with disturbed land area of five acres or greater are required to obtain a permit from the Georgia Environmental Protection Division to discharge storm water. Obtaining the storm water discharge permit is a two-step process Submitting a Notice of Intent to discharge storm water and Compliance with the State of Georgias General Permit requirements. A primary component of compliance with Georgias General Permit requirements is the preparation and implementation of a Stormwater Pollution Prevention Plan SWPPP. This document is organized to function as a guide to meet SWPPP requirements. The step-by-step guidelines and checklists show the process of developing and implementing a SWPPP for construction sites at Robins AFB, GA. -BKA

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms