Basin F Overburden and Soil Sampling and Analysis Study, Rocky Mountain Arsenal

reportActive / Technical Report | Accession Number: ADA286308 | Open PDF

Abstract:

A study aimed at developing the required contaminant distribution information was authorized and funded by USATHAMA. The study included development of sampling protocol, sample collection, leach testing, analysis, and report preparation. This report summarizes the work conducted by the various contractors, documents the data obtained, presents the resulting conclusions, and provides certain recommendations. Boring logs and data reports have been appended.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms