Groundwater Treatment Study for South Plants and Basin a Neck, Task 26

reportActive / Technical Report | Accession Number: ADA286086 | Open PDF

Abstract:

Task 26 involves developing a conceptual design for facilities which will control and treat the ground water in the south plants and basin a neck areas. This technical plan describes the activities that will be performed to complete the design. The objectives of task 26 include Determine the ground water flow rates and migration patterns, Determine dewatering rates for a ground water treatment plant, Evaluate the impact of ground water control on the lakes, Conceptually design ground water control and dewatering schemes and treatment facilities, Develop cost estimates for the system.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms