Reliability Centered Maintenance

reportActive / Technical Report | Accession Number: ADA236693 | Open PDF

Abstract:

This paper addresses the requirement for Reliability Centered Maintenance RCM in fielded weapon systems. While RCM is incorporated into developing weapon systems through the Logistics Support Analysis LSA process, it is not fully utilized in the post production process. Systems fielded with the benefit of RCM are not routinely revisited to ensure that the inherent reliability is being achieved. Preventive maintenance tasks are modified, primarily as a result of user response and not through the integrated use of usage data and viable engineering analysis. The use of Reliability Centered Maintenance as an alternative maintenance strategy, service wide, is recommended to ensure that the inherent reliability of a weapon system is realized at minimum cost.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release
Distribution Statement:
Approved For Public Release; Distribution Is Unlimited.

RECORD

Collection: TR
Identifying Numbers
Subject Terms