Improved Procedure for Loading the M198 Towed Howitzer Aboard a C130 Cargo Plane.
Abstract:
The original procedure for on and off loading the M198 howitzer aboard a C130 cargo plane was determined to be time consuming and logistically unacceptable. This report details the reconfiguration of the howitzer from wide to narrow tires and the development of an improved jacking system and front bumper pintle assembly to improve air transportability. Keywords Low Altitude Parachute Extraction System LAPES rails.
Security Markings
DOCUMENT & CONTEXTUAL SUMMARY
Distribution:
Approved For Public Release
RECORD
Collection: TR