Review of Reports, Charleston Harbor, South Carolina. Appendices. Wando River Extension. Revision.
Abstract:
The most desirable plan from an economic safety and environmental standpoint would provide for a channel 40 feet deep and 450 feet wide from the existing Charleston Harbor project to a turning basin with a turning diameter of 1200 feet. Appendixes A Study Authorizations, Prior Reports and Public Meetings B Problem Identification C Economic Analysis D Engineering Investigation Design and Cost Estimates E Environmental Analysis F Formulation, Assessment and Evaluation of Detailed Plan G Comments from Other Agencies.