National Dam Safety Program. Lake Paho Dam (MO 10108), Missouri - Grand - Chariton Basin, Mercer County, Missouri. Phase I Inspection Report.

reportActive / Technical Report | Accession Number: ADA105155 | Open PDF

Abstract:

The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 46 of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood PMF is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. An additional deficiency, in accordance with the guidelines, is the lack of seepage analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were spalling of spillway concrete, open joints in the spillway, some deterioration of riprap, bank erosion at the end of the spillway stilling basin and erosion in a few small areas on the upstream slope.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms