A Methodology for Simulating Mission Deferment in the Tactical Vehicle Evaluation Model (TVEM). Addendum
Abstract:
A methodology to permit the deferral of missions in anticipation of slack periods in the mission schedule has been developed and incorporated in the Tactical Vehicle Evaluation Model TVEM. This reports, an addendum to AMSAA technical Report No. 311, dated October 1980, documents this methodology improvement. Included are the program listing, deferment program narrative, test case input and input and output, and other detailed documentation. Author
Security Markings
DOCUMENT & CONTEXTUAL SUMMARY
Distribution:
Approved For Public Release
Distribution Statement:
Approved For Public Release; Distribution Is Unlimited.
RECORD
Collection: TR