National Dam Safety Program. Wagamons Pond (DE00061), Delaware River Basin, Broadkill River Basin, Sussex County, Delaware. Phase I Inspection Report.

reportActive / Technical Report | Accession Number: ADA069616 | Open PDF

Abstract:

This report cites results of a technical investigation as to the dams adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dams general condition is included in the report. Author

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms