Expedient Upgrading of Existing Structures for Fallout Protection.

reportActive / Technical Report | Accession Number: ADA053763 | Open PDF

Abstract:

This study was conducted in support of the Defense Civil Preparedness Agencys DCPA Crisis Relocation Planning CRP program in which existing structures will be upgraded to provide fallout shelters for a relocated population. A demonstration test was conducted in which a residential dwelling was upgraded by placing soil against the walls and on the roof of the structure. The shelter was large enough to house 80 people. Upgrading was accomplished partially by hand labor and machinery. The test showed that a conventional structure could be upgraded and that the shelter occupants using tools and materials found in most homes could if necessary upgrade their shelter during the expected 2- or 3-day period of crisis relocation preceding a nuclear attack.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Identifying Numbers
Subject Terms