PEB/LOE Preparation Assistance Program. Interim Evaluation Report for USS Francis HAMMOND (DE-1067) USS MARVIN SHIELDS (DE-1066).
Abstract:
This interim report, prepared in accordance with Task 10 of the contract task order, is intended to Present the criteria that constitute a baseline for evaluating the effectiveness of the PEBLOE Preparation Assistance Program Present the data resulting from LOE preparation efforts of two DE-class ships selected by ARINC Research as a baseline group, and two designated by PERACRUDES for the assistance program Compare the data for the baseline and program ships and Evaluate the data and comparisons to determine the effectiveness of the assistance program. The ships selected as the baseline group are USS MEYERKORD DE-1058 and USS ROARK DE-1053. The PEBLOE preparation activities on these ships will be compared through appropriate data elements with the corresponding activities of the first two ships to participate in the assistance program- USS FRANCIS HAMMOND DE-1067 and USS MARVIN SHIELDS DE-1066.