Risk Analysis of the M11OE2 SP Howitzer (from DEVA IPR to Initial Operating Capability).

reportActive / Technical Report | Accession Number: ADA022359 | Need Help?

Abstract:

This study was performed to assess the cost and schedule risks associated with achieving Initial Operating Capability IOC of the M11OE2 Self-Propelled Howitzer using the XM188E3 propellant charge Zone 8 only and firing the M106 Projectile.

Security Markings

DOCUMENT & CONTEXTUAL SUMMARY

Distribution:
Approved For Public Release

RECORD

Collection: TR
Subject Terms