COMPLEX 576A (65-1), LAUNCH COMPLEX AND MISSILE ASSEMBLY BUILDING, SYSTEMS INTEGRATION, ACCEPTANCE TESTING AND TEST PROCEDURE REQUIREMENTS. ENGINEERING SCHEDULE D/IOC 8.0.2 AND 8.0.3

reportActive / Technical Report | Accession Number: AD0830216 | Open PDF

Abstract:

The enclosures supersede all previous schedules and are the official engineering schedule for Integration Testing of GSE and Facility Equipment installation at the Launch Complex and the Missile Assembly Building of 576A 65-1. The schedules reflected are based upon the weekly status report per integrated test plan.