CMP Instructions, Specifications, and Example.

reportActive / Technical Report | Accession Number: AD0768098 | Need Help?

Abstract:

The problem was to develop a construction scheduling model for the Army Functional Component System AFCS which could be used by engineers in the field, theater-of-operation planners, and base development planners. To fulfill this requirement a Facility Scheduling Model and an Installation Tabulation Model were developed. Also included are instructions for architects and engineers and an example of the model. The Installation Tabulation Model duration was compared with duration derived by the CERL Construction Management Procedure CMP Computer Simulation Model. The comparison results in a recommended 1.35 multiplication factor for the Installation Tabulation Model. Author