SYNTHETIC QUARTZ.
Abstract:
The study was accomplished concurrently with the procurement of a pilot run of 4390 Synthetic Quartz crystals, weighing 969.9 pounds. Quantities in pilot run were sufficient for determining mass production methods and required production and test equipment. Execution of Step II, Preparedness Measures resulted in an indicated lead time gain of 0 months to the initiation of production and 3 months to peak production as compared to no preparedness.
Security Markings
DOCUMENT & CONTEXTUAL SUMMARY
Distribution:
Approved For Public Release
RECORD
Collection: TR