Several modifications were introduced which provided cost savings both through simplified production procedures and the utilization of more economic materials. As a result of this study, a substantial improvement in the costeffectiveness of the projectile has been realized. Among the most significant technical accomplishments resulting from this study is the development of an improved method of assembling flechettes by use of a weaving method. This breakthrough enabled the manufacture of Beehive ammunition on a mass production basis.