Accession Number:

ADB073385

Title:

ICAM Manufacturing Cost/Design Guide. Volume 2. Airframes. User's Manual.

Personal Author(s):

Corporate Author:

BATTELLE COLUMBUS DIV OH

Report Date:

1983-01-01

Abstract:

This section contains format selection aids, identification of the types of parts analyzed for data to determine the manufacturing man-hour data, examples of how the data are utilized in airframe design and a set of formats. These formats include cost-driver effects CDE, cost-estimating data CED, and designer-influenced cost elements DICE. Author

Descriptive Note:

Final technical rept. 1 Oct 79-31 Oct 82,

Supplementary Note:

See also Volume 3, AD-B073 386L.

Pages:

0214

Communities Of Interest:

Modernization Areas:

Distribution Statement:

Approved for Public Release; Distribution Unlimited.

Contract Number:

F33615-79-C-5102

File Size:

6.80MB