Title:

National Dam Safety Program. Finch Hollow Watershed Project, Site 1. Inventory Number NY-697 Susquehanna River Basin. Broome County, New York. Phase I Inspection Report,

Personal Author(s):

Corporate Author:

NEW YORK STATE DEPT OF ENVIRONMENTAL CONSERVATION ALBANY

Report Date:

1979-08-01

Abstract:

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Finch Hollow Project-Site 1 did not reveal conditions which pose a hazard to humanlife or property. Total spillway discharge capacity is adequate for the PMF. An immediate investigation is required to ascertain the flooding potential of homes located between the dam and the highway embankment. Subsequent remedial measures must be completed within 1 year of notification. Several remedial actions during construction season are required. Author

Pages:

0097

Subject Categories:

Communities Of Interest:

Modernization Areas:

Distribution Statement:

Availability: Document partially illegible.

Contract Number:

DACW51-79-C-0001