DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA067282
Title:
The Effects of Regulatory Constraints on the Delivery of DoD Weapons Systems.
Corporate Author:
INSTITUTE FOR DEFENSE ANALYSES ARLINGTON VA PROGRAM ANALYSIS DIV
Report Date:
1978-07-01
Abstract:
This paper presents an analysis of the economic effects that federal regulatory controls, especially environmental regulations and safety-and-health directives, have had on the US defeense industrial base. Special reference is made to the ferrous foundry industry, since it has been alleged that the loss of production capacity in this industry has been heavily impacted by pollution control and safety-and-health requirements imposed by federal regulatory agencies. Author
Descriptive Note:
Final rept.,
Pages:
0067
Contract Number:
DAHC15-73-C-0200
File Size:
25.38MB