Accession Number:

ADA010725

Title:

Guidelines for Material Placement in Marsh Creation.

Corporate Author:

CENTER FOR THE ENVIRONMENT AND MAN INC HARTFORD CONN

Report Date:

1975-04-01

Abstract:

The report presents a systematic set of guidelines for creating new marshes from dredged material under a variety of situations and constraints. New marshes are characterized on the basis of the frequency of dredging, confinement requirements and the need for surcharging. Pertinent information on important physical environmental factors, dredging and disposal operational practices, and engineering properties of dredged materials is used to develop guidelines for creating each type of marsh.

Descriptive Note:

Final rept.,

Supplementary Note:

Report on Dredged Material Research Program.

Pages:

0228

Subject Categories:

Contract Number:

DACW39-74-C-0094

File Size:

0.00MB

Full text not available:

Request assistance