DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0920808
Title:
SST Technology Follow-on Program-Phase II. ADEDS Flight Test Report. Volume II. Airplane Installation.
Corporate Author:
BOEING COMMERCIAL AIRPLANE CO SEATTLE WA
Report Date:
1974-02-01
Abstract:
The Advanced Electronic Display Systems ADEDS task of the SST Technology Follow-On Program includes the installation and flight test of display and navigationguidance hardware and software developed under this task. This report provides a summary photographic description of the installation in the flight test airplane- 737-100, NASA 515 and a description of the basic airplane performance and systems configuration. Primary locations for installation include the flight deck First Officers position, passenger cabin, forward cargo bay, and the weather radar radome cavity. A palletized installation concept was used for installing the experimental equipment except where the function to be performed specified a location not amenable to palletization or where basic airplane equipment racks provided the space required without modification. Author
Descriptive Note:
Final rept. on Task 6,
Supplementary Note:
See also Volume 1, AD-920 807L.
Pages:
0068
Contract Number:
DOT-FA72WA-2893
File Size:
0.00MB