Accession Number:

AD0919249

Title:

Check Test of Power Unit (PU-625) Under Arctic Winter Conditions.

Personal Author(s):

Corporate Author:

ARMY ARCTIC TEST CENTER FORT GREELY AK

Report Date:

1974-04-08

Abstract:

A check test of the Power Unit PU-625 was conducted by the Arctic Test Center under arctic winter conditions at Fort Greely, AK. Operational testing was performed in temperatures ranging from 0 to -59 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, safety, human factor engineering, and value engineering subtests were conducted. The purpose of the test was to determine if a previously reported deficiency had been corrected and that no new deficiencies were introduced by modifications. It was concluded that the PU-625 started as required in temperatures down to -59 F and that the previous deficiency had been corrected.

Descriptive Note:

Final letter rept. 30 Oct 73-7 Mar 74,

Pages:

0017

Identifiers:

Communities Of Interest:

File Size:

0.00MB

Full text not available:

Request assistance