DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0883621
Title:
System 621B/ATS-5 Signal Demonstration Test.
Corporate Author:
APPLIED INFORMATION INDUSTRIES MOORESTOWN NJ
Report Date:
1971-02-26
Abstract:
A test experiment has been accomplished in which L- and C-band range measurements have been made between a fixed ground station at Mojave, California, and the ATS-5 satellite on-orbit. These tests covered a three-month period from October 1970 to January 1971 and produced comparative data for use in evaluating the ionospheric propagation effects at L-band frequencies. The ATS-5 satellite is spinning and has a reception window of approximately 50 milliseconds with each rotation. The test instrumentation reacquired the satellite signal within a few milliseconds at the beginning of each reception and performed both an L-band and a C-band measurement during the burst. Author
Descriptive Note:
Final technical rept.,
Pages:
0134
Contract Number:
F04701-70-C-0281
File Size:
0.00MB