DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0857138
Title:
Operation and Service Manual for ECS Primary O2 and Water System Low Pressure Leak Rate Tester 52E180194.
Corporate Author:
MCDONNELL DOUGLAS ASTRONAUTICS CO ST LOUIS MO
Report Date:
1968-12-06
Abstract:
The purpose of the report is to familiarize personnel with the operation and service instructions for the Environmental Control System ECS Primary O2 and Water System Low Pressure Leak Rate Tester. The two configurations are physically and functionally identical. The report presents a description of the tester, its control and indicator functions, and service instructions for preventive maintenance. Author
Pages:
0026
Contract Number:
F04695-67-C-0023
File Size:
0.00MB