Accession Number:
AD0852260
Title:
Factory Acceptance Testing of Missile 125D.
Corporate Author:
GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA
Report Date:
1961-06-19
Abstract:
Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system Electrical system Flight control system Guidance system Propellant utilization system and Propulsion system. Author
Pages:
0035
File Size:
0.00MB