Accession Number:

AD0847309

Title:

Long-Period Triaxial Seismograph Development

Personal Author(s):

Corporate Author:

GEOTECH GARLAND TX

Report Date:

1969-01-27

Abstract:

The redesigned triax seismometer module has been completed and transported to Fairbanks, Alaska, for operational tests. A triax borehole facility has been prepared at the Murphy Dome ALPA site 3-4 approximately 40 miles northwest of Fairbanks. The improved module and two of the engineering prototype modules operated at UBSO have been installed at site 3-4 and field evaluation is now in process.

Descriptive Note:

Quarterly rept. no. 10, 1 Oct-31 Dec 1968

Pages:

0011

Communities Of Interest:

Distribution Statement:

Approved for public release; distribution is unlimited.

Contract Number:

AF 33(657)-16406

Contract Number 2:

ARPA ORDER-624

File Size: