Accession Number:

AD0832470

Title:

COMPLEX 65-1 PRESSURIZATION CONTROL UNIT PERIODIC VALIDATION PROCEDURE,

Personal Author(s):

Corporate Author:

GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Report Date:

1959-04-02

Abstract:

This procedure provides the test sequence required to establish that the Pressurization Control Unit PCU is in a satisfactory operating condition for ground pressurization of the Missile Fuel and LO2 Tanks. Author

Pages:

0014

Communities Of Interest:

File Size:

0.00MB

Full text not available:

Request assistance