DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0831109
Title:
REDRAW TECHNIQUES FOR PRODUCTION OF THIN-WALLED COLUMBIUM ALLOY TUBING.
Corporate Author:
WHITTAKER CORP WEST CONCORD MA NUCLEAR METALS DIV
Report Date:
1968-03-01
Abstract:
Procedures were developed by which D-43 tubing was drawn in 60 foot lengths to 0.125-inch ID x 0.006 inch wall. Starting with redraw stock 0.250 inch ID x 0.030 inch wall, the tubing was drawn in a nine-pass schedule which included one intermediate anneal and one solution-and-age treatment. Techniques were also established for lubricating, stripping, and cleaning these long tube lengths. Author
Descriptive Note:
Final engineering rept. 15 Apr 66-30 Dec 67,
Pages:
0050
Contract Number:
AF 33(615)-2029
File Size:
0.00MB