Accession Number:

AD0809709

Title:

OPERATION OF UBSO

Personal Author(s):

Corporate Author:

GEOTECH GARLAND TX

Report Date:

1967-02-20

Abstract:

This report describes the operation of the Uinta Basin Seismological Observatory from 1 November 1966 through 31 January 1967. Modifications and additions to the observatory instrumentation are described, and tests to improve the operation of the observatory are reported. Also discussed is the status of special investigations designed to evaluate and improve the detection capability of the observatory.

Descriptive Note:

Quarterly rept. no. 3, 1 Nov 1966-31 Jan 1967

Supplementary Note:

DOI: 10.21236/AD0809709

Pages:

0044

Communities Of Interest:

Modernization Areas:

Distribution Statement:

Approved for public release; distribution is unlimited.

Contract Number:

AF 33(657)-16563

Contract Number 2:

ARPA ORDER-624

File Size:

2.72MB