Accession Number:

AD0804451

Title:

COMMERCIAL SUPERSONIC TRANSPORT PROGRAM. PHASE II-C. INTERIM AIRCRAFT PERFORMANCE ASSESSMENT REPORT. PROPULSION CONTROLS PERFORMANCE SPECIFICATION.

Corporate Author:

BOEING CO RENTON WA

Report Date:

1965-11-15

Abstract:

This specification describes the principal physical and functional characteristics of the control systems necessary to start, set, vary thrust, and stop the General Electric GE4J5G engine. The design requirements are specified. Ground and flight tests to ensure that the control systems are satisfactory have been established. System performance requirements established herein are design objectives to be applied to the prototype airplanes. Application of these requirements to production airplane design will be established after prototype flight testing. Author

Pages:

0021

Communities Of Interest:

Contract Number:

FA-SS-66-5

File Size:

0.00MB

Full text not available:

Request assistance