Accession Number:

AD0607972

Title:

GOODYEAR AEROSPACE TEST FACILITY ARC HEATED WIND TUNNEL.

Personal Author(s):

Corporate Author:

GOODYEAR AEROSPACE CORP AKRON OHIO

Report Date:

1963-10-01

Abstract:

A summary of tests conducted in the Goodyear Aerospace Arc Heated Wind Tunnel is presented. This hyperthermal test facility is a non re-circulating arc tunnel with a continuous steam ejector evacuation system. The 1.8 mega watt input power is supplied by three diesel-electric locomotives. The arc or plasma generator utilizes water cooled concentric copper electrodes with magnetic spin stabilization. The arc operation time, arc head component life and diesel power utilization are summarized. Test procedures and operation of the arc tunnel are described. Development and modifications to the facility are discussed. Brief results and discussions of company funded test programs of a development nature are presented. The simulation capabilities and the operating envelope of the arc tunnel are given along with the typical test points attained during the report period. Author

Descriptive Note:

Rept. for 15 Apr 62-15 Oct 63,

Pages:

0059

Communities Of Interest:

Contract Number:

AF33 616 7599

File Size:

0.00MB

Full text not available:

Request assistance