Accession Number:

AD0601185

Title:

7486 CERAMIC TRIODE PRODUCTION ENGINEERING MEASURE.

Personal Author(s):

Corporate Author:

GENERAL ELECTRIC CO OWENSBORO KY

Report Date:

1964-03-01

Abstract:

The Inspection and Quality Control Plan was submitted and found acceptable. In the pilot production phase, fabrication of tubes was completed. Testing to the applicable specification was completed with the exception of life tests. A bill of materials was prepared and submitted. Author

Descriptive Note:

Quarterly progress rept. no. 7, 1 Jan-31 Mar 64

Pages:

0015

Contract Number:

DA36 039SC86738

File Size:

0.00MB

Full text not available:

Request assistance