Accession Number:

AD0504944

Title:

BLU-40/B Delay Fuze Producibility Study.

Personal Author(s):

Corporate Author:

HONEYWELL INC HOPKINS MINN ORDNANCE DIV

Report Date:

1968-08-01

Abstract:

The prime objective of the producibility study was to reduce the production cost of the BLU-40B R and D fuze and shorten the lead time for a high-production facility. The program was comprised of 1 a producibility study and evaluation of preliminary design concepts by contractor testing 2 fabrication of development test units and evaluation of their compliance with the requirements as set forth in specification ATW 67-96 3 production of fuzes, vanes and smoke-generating bomb assemblies for flight testing at Eglin AFB 4 a man-hour Value Engineering Study commencing upon completion of development tests 5 production of fuzes and vanes for government use to be specified and 6 completion of Form 1423 data items.

Descriptive Note:

Final rept. 30 Jun 67-30 Mar 68,

Supplementary Note:

Pages:

0149

Communities Of Interest:

Distribution Statement:

Contract Number:

F08635-67-C-0156

Contract Number 2:

Full text not available:

Request assistance