Accession Number:

AD0488287

Title:

MEAN LEAD TIME (M/LT),

Personal Author(s):

Corporate Author:

NAVAL SUPPLY DEPOT MECHANICSBURG PA APPLICATION DEVELOPMENT DIV

Report Date:

1964-07-10

Abstract:

This study has the intended purpose of providing the manager a better estimate of lead times for new items where the lead time for the particular item is unknown. The method used is based on the assumption that items with similar names, designed for similar application, will require similar lead times. The output of the program is an average lead time for established stock list items of similar nomenclature and application. The results of this study indicate about 30 of the sub-families can be processed with a shorter lead time and about 10 require a longer lead time than present policy affords. In terms of items, 12 of the items will have significantly shorter lead times and 7 will have significantly larger ones. Author

Pages:

0032

File Size:

0.00MB

Full text not available:

Request assistance