SPECIAL TEST EVALUATION REPORTS - STP III ECP 51 SYSTEM COMPATIBILITY TEST - ST-114,

Personal Author(s):

Corporate Author:

BOEING CO SEATTLE WA

Report Date:

1964-06-29

Abstract:

Four equipment configurations were tested as follows to evaluate equipment compatibility. The Flatbed Trailer was positioned facing the aft end of the TE, the ECU was loaded and the ducting was connected between the ACU and the TE during the first configuration. In the second configuration the aft end of the trailer was positioned to the aft end of the TE, the ACU was loaded, and the ducting was connected. The Flatbed Trailer was positioned perpendicular to the TE axis and the ducts connected to the SSCBM ports. The Flatbed TrailerACU was connected to the Escort Vehicle pintle hook during the final configuration. The air flow to the TE was not adversely affected by the ECP 51 hardware and no safety hazards were encountered. Author

Pages:

0030

Contract Number:

AF04 694 422

File Size:

0.00MB

Full text not available:

Request assistance