Accession Number:

AD0423244

Title:

PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH-RELIABILITY CAPACITORS.

Personal Author(s):

Corporate Author:

SPRAGUE ELECTRIC CO NORTH ADAMS MASS

Report Date:

1963-06-30

Abstract:

Work on production design engineering and design of pilot line equipment continues. The possibility of combining the action of the cold tubulation soldering machine with that of the hot tubulation soldering machine remains under c6nsideration. Author

Descriptive Note:

Quarterly rept. no. 2, 31 Mar-30 June 63,

Pages:

0019

Contract Number:

DA36 039AMC01460E

File Size:

0.00MB

Full text not available:

Request assistance