DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0370417
Title:
PLAN FOR Z(XQ-5)ZTARGET TEST FLIGHTZ(2(XQ5-3)1)Z.
Corporate Author:
LOCKHEED AIRCRAFT CORP VAN NUYS CALIF
Report Date:
1956-12-21
Abstract:
This test plan is for flight 2XQ5-31, the second of a series of test flights designed to demonstrate the performance and recovery capabilities of the XQ-5 Target System and to provide design evaluation data. This test flight plan is essentially the same as that for flight 1XQ5-11. As a result of flight 1XQ5-11 structural modifications and an improved instrumentation schedule have been incorporated. A standard target has been modified to accomodate test equipment by incorporating a longer nose section. This target is designated XQ5-3. Instrumentation will include one FMFM and one PWMFM telemeter system transmitting information from approximately 90 sources. In addition to the telemeter system, cameras in the target, in the launch aircraft, and on the ground will document preflight, inflight, recovery, and postflight operations, characteristics, and conditions. Performance of the target during the test will furnish data to evaluate the test objectives and provide information to be used in planning subsequent flights. Author
Pages:
0014
Contract Number:
AF 33(600)27591
File Size:
0.00MB