Accession Number:

AD0288114

Title:

PRODUCIBILITY STUDY OF ADAPTION KIT ATOMIC WARHEAD TO ROCKET, XM77 PHASE II ASSOCIATED INSPECTION AND TEST EQUIPMENT

Corporate Author:

GENERAL ELECTRIC CO BURLINGTON VT

Report Date:

1961-12-31

Abstract:

Char s are presented which list all the gages, fixtures, test panels, and other inspection and test equipment designed and procured for use with the XM77 Adaption Kit and its components. Author

Pages:

0001

Communities Of Interest:

Contract Number:

DA28 017 501ORD3617

File Size:

0.00MB

Full text not available:

Request assistance