Accession Number:

AD0260508

Title:

INDUSTRIAL PREPAREDNESS STUDY ON DEVICES 1, 13, 14, 15

Personal Author(s):

Corporate Author:

RADIO CORP OF AMERICA SOMERVILLE N J

Report Date:

1961-04-30

Abstract:

Work on Device 1 was com leted. The production phase testing program and the pilot run requirements for the PNP version of devices 13 and 14 were completed and the line shut down. Production testing for these units was initiated. Author

Pages:

0001

File Size:

0.00MB

Full text not available:

Request assistance